One Central |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) |
General |
|
|
|
|
|
|
|
|
|
|
Location |
|
: Sen. Gil Puyat Avenue cor. Geronimo Street, Makati City |
|
|
|
|
|
|
|
|
|
|
|
|
|
2) |
Architectural |
|
|
|
|
|
|
|
|
|
|
Main Entrance |
|
: Main entrance and vehicular egress/ingress at Geronimo |
|
|
|
|
|
Street and Dela Costa Street, Makati City |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Modern interior lobby with high ceiling |
|
|
|
|
|
|
|
floor-to-ceiling curtain glass |
|
|
|
|
|
|
|
|
Centerpiece reception counter with Old English Artworks |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Residential Floors |
: 3/F - 6/F = 7 units of 1BR, 2BR & 3BR (Tree Tops Units) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8/F - 43/F = 19 units of Studio, 1BR, 2BR & 3BR (no 13/F) |
|
|
|
|
|
45/F = 10 units of Studio, 1 BR, 2BR & 3BR (no 44/F) |
|
|
|
|
|
|
46/F - 49/F = 10 units of Studio, 1BR, 2BR & 3BR (no 47/F) |
|
|
|
|
|
50/F = 10 units of 1BR, 2BR, 3BR & 5BR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total of 708 residential units |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Retail Area |
|
: Ground Floor Level |
|
|
|
|
|
|
|
|
|
Commercial units with gross area of 752.87 sq. m. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Parking |
|
|
: B3-B5 basement level (245 slots subject to change) |
|
|
|
|
|
|
2/F - 6/F (203 slots) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total of 448 slots (subject to change) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Amenities |
|
: Swimming Pool & Kiddie Pool, Playground, Outdoor & |
|
|
|
|
|
Function Areas, Rock Garden, Palm Garden, Aromatic Garden, |
|
|
|
|
|
Walkway & Sculpture Garden, Day Care Center, |
|
|
|
|
|
|
Business Center, Function Room, Gym |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Exterior Finishes |
|
: Contemporary Architecture |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3) Structural |
Structural |
|
|
|
|
|
|
|
|
|
|
Foundation |
|
: Reinforced concrete mat foundation |
|
|
|
|
Structures |
|
: High-strength reinforced concrete frame |
|
|
|
|
Supporting System |
: Dual shear wall combined with beam-column frame system |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Design Criteria |
|
: As per International and National Structural Codes for |
|
|
|
|
|
|
seismic resistant structures |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4) |
Electrical & Auxiliary |
|
|
|
|
|
|
|
|
Primary Power |
|
: 34.5 KVA Meralco main line |
|
|
|
|
|
Back-up Power |
|
: Stand-by Genset for selected area back-up power |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) |
Mechanical |
|
|
|
|
|
|
|
|
|
|
Vertical Transport |
: 6 high speed passenger elevators and 2 service elevators |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Air Conditioning |
|
: Centralized air-conditioning system at main lobby |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) |
Plumbing |
|
|
|
|
|
|
|
|
|
|
Water Supply System |
: Complete cold water lines and sanitary pumps |
|
|
|
|
|
|
Hot water line provision (water heater not included) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Water Storage |
|
: Overhead water tank and underground cistern |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Fire Protection |
Fire Protection |
|
|
|
|
|
|
|
|
|
|
Sprinkler |
|
: Automatic fire sprinkler system |
|
|
|
|
|
|
|
|
Fire alarm and detection system |
|
|
|
|
|
|
|
|
Fire hose cabinet & fire extinguishers in all floors |
|
|
|
|
|
|
Luminous fire exit locator chart or fire exit sign |
|
|
|
|
|
|
Stair pressurization |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) |
Telecom and Security System |
|
|
|
|
|
|
|
|
|
|
: Closed circuit TV security system in main lobby |
|
|
|
|
|
|
Individual intercon of PABX with security camera system |
|
|
|
|
|
Provision of 2 telephone lines, internet-ready line |
|
|
|
|
|
|
Provision of cable TV lines |
|
|
|
|
|